On 1 July 2019, Western Power will introduce a revised fee structure that includes an upfront application fee, new designs fees and revised information/conformance services fees for all distribution customer projects.
Watch the video for a detailed overview
The revised fee structure will apply to distribution applications including:
• new connections
• modifying a power supply
• isolations
• relocations
• unmetered supplies
• external design and construct
The table below summarises the planned changes: